Skip to main content

Timeline for Ullage control on stage shutdown?

Current License: CC BY-SA 4.0

3 events
when toggle format what by license comment
Apr 5, 2021 at 22:23 comment added DrSheldon @user39728: Best to use ullage in that case. I have numbers handy for Saturn IB. First stage engine cutoff at T+140.65, second stage engine start T+143.35. That's less than 3 seconds between stages, and they still used ullage motors!
Apr 5, 2021 at 21:27 comment added user39728 Thanks! Would 15s between MECO and stage-2 engine startup be too much? Or would stage the engine maybe be able to fire right away without ullage control?
Apr 5, 2021 at 21:23 history answered DrSheldon CC BY-SA 4.0