NASA Spaceflight's Final JAXA H-II Transfer Vehicle bids farewell to ISS says:

Following CBM vestibule depressurization, 16 bolts that held the Kounotori 9 spacecraft to the Station were removed in four stages of four bolts. This officially marked the detachment of the vehicle from the ISS.

How was this unbolting accomplished? Where did the bolts go? Who or what did the unbolting? Were they explosive bolts or did someone use a wrench on them or were they motorized or something else?

If done via explosive bolts or motors, is it done under computer control, or does someone push a button or issue four separate commands for the four stages of unbolting, or is it just a "go" command and the four stages are implemented by an automated sequencer?

$\endgroup$
0

1 Answer 1

16
$\begingroup$

The bolts are part of the Common Berthing Mechanism (CBM).

The Common Berthing Mechanism (CBM) is a complex collection of latches, bolts, Ready to Latch (RTL) indicators ... and computers to control this equipment. This system can be operated by either the ground or the crew; extravehicular activities (EVAs) (i.e., spacewalks) are not required to use this mechanism, unlike some of the truss attachment systems. Once a new module is close enough to the ISS (RTL), four latches on the ISS side (usually a Node module) are used to reach out and “grab” the incoming module and pull it closer. Alignment guides ensure the bolts and nuts of the mechanism are in line with each other. Once the latches have pulled the two halves together, bolts on the active CBM are extended into nuts on the passive CBM. Each of the 16 bolts has a preload of approximately 90 kN (20,230 lbs) of force on it after the bolting sequence is complete.

enter image description here

This diagram shows one of the four controller panel assemblies with its four associated bolts and one associated latch.

enter image description here

The CBMs are normally operated by the crew. The Personal Computer System (PCS) (aka ISS laptop) display used to control and monitor the CBMs is shown here.

enter image description here

The bolting stages are described here

Bolting is conducted in several stages. The first stage acquires all 16 bolts and their mating nuts and torques them to an “acquire bolt preload” of 1500 pounds (as measured by strain gages within the bolts, and monitored by the CBM Bolt Controllers). After the preload torque is complete, further torquing is discontinued so that temperatures between the passive ring and active ring can equalize. Once the temperatures are equalized,the torquing operation resumes. Bolts are commanded, in-groups of four, through several more torquing stages, proceeding from the initial preload of 1500 pounds up to a final load of 19,300pounds per bolt. The module is then in its fully berthed position.

Here is a picture of the bolt actuator and a schematic showing a "ready to bolt" bolt.

enter image description here

enter image description here

For further reading: the document below "The Common Berthing Mechanism for ISS" is recommended.

References

$\endgroup$
2
  • 1
    $\begingroup$ Wow even excellenter than when I commented previously! Thanks for the edits and all those other goodies! $\endgroup$
    – uhoh
    Commented Aug 19, 2020 at 7:11
  • 2
    $\begingroup$ I love how much freely available documentation exists for NASA related projects and standards. $\endgroup$ Commented Aug 19, 2020 at 16:05